Updated 1/9/19


Lab Science Building (SBC #166/011-11-2013)

Current work:

Upcoming work:

  • Interior and exterior wall framing continues
  • Exterior masonry work continues
  • Roofing work continues
  • Building systems work continues

Student Recreation Center (SBC #166/011-13-2014)

Current work:

  • Building nearing dry-in (weather resistant shell)
  • Roof installation underway
  • All interior slabs poured and interior system installation continues
  • Exterior masonry started
  • Real-time webcam at https://app.oxblue.com/open/denark/tennesseetech

Upcoming:

  • Interior and exterior wall framing continues
  • Exterior masonry work continues
  • Roofing work continues
  • Building systems work continues

Roaden University Center (SBC #166/011-14-2014)

Upcoming:

  • Work on exterior landscaping between building and Peachtree Avenue to create greenspace in accordance with university master plan (not part of SBC project scope; will be done by university facilities)


Browning/Evins Residence Halls (SBC #166/011-18-2015)

  • Electrical, plumbing and mechanical/HVAC progressing
  • Work on new lobby area progressing
  • Epoxy flooring in restrooms being installed
  • New doors scheduled for delivery Feb. 18

Bartoo and Kittrell Halls (SBC #166/011-05-2016A)

Past two weeks:

  • Drywall installation complete in Kittrell
  • Painting began in Kittrell
  • Drywall installation ongoing in Bartoo
  • Flooring installation on 2nd/3rd floor of Kittrell
  • Plumbing rough-ins complete
  • Concrete sidewalk repairs complete

Next two weeks:

  • Kittrell flooring installation
  • Drywall installation at Bartoo
  • Restroom fixture installation
  • Window trim in Bartoo
  • Ducting installation in both buildings


Poultry Center Facility (SBC #166/011-01-2017)

  • Preliminary sketches under review

Library Brick Replacement (SBC #166/011-06-2016A)

  • Work nearing completion on front of library
  • Proceed to ends of building once front is completed

Library Excavation Project (SBC #166/011-03-2016)

  • Interior walls in place in archives
  • Interior walls nearing completion in testing area
  • Installation of building systems nearing completion

Next two weeks:

  • Completion of building systems and walls
  • Start interior finishes


University Drive Upgrade west of Willow Ave. (SBC #166/011-02-2016B)

  • Reviewing final designs
  • Anticipate bid 2019

Roof Replacement and Repairs (SBC #166/011-07-2015A)

  • Hyder-Burks, Clement and Bruner nearly complete
  • Brown work started

Residence Hall Roof Replacement (SBC #166/011-02-2018)

  • Cooper-Dunn work progressing